Operations
Efficient and Reliable Power Generation in Riau, Indonesia
Our Plant
The Medco Riau power plant (Riau IPP) is a 275 MW combined cycle gas-fired power plant located in Riau, Indonesia. Using two GE 6F.03 gas turbines in a 2x1 combined cycle configuration, the plant supplies efficient, reliable and environmentally-friendly electricity to PT PLN (Persero) under a long-term agreement.
275 MW CCGT
2x GE 6F.03
February 2017
How Our Plant Works
Our plant operates in a 2x1 CCGT configuration, utilizing two GE 6F.03 gas turbines, HRSGs, and a steam turbine to generate a total of 275 MW of electricity efficiently and reliably.
- 2x GE 6F.03 Gas Turbines
- Each turbine has a nameplate capacity of 81 MW
- 2x Heat Recovery Steam Generators (HRSGs)
- 1x Steam Turbine
- 2x1 Combined Cycle Configuration
2x1 Combined Cycle Gas Turbine (CCGT) Configuration
Our plant operates in a 2x1 CCGT configuration, utilizing two GE 6F.03 gas turbines, HRSGs, and a steam turbine to generate a total of 275 MW of electricity efficiently and reliably.
Key Equipment & Configuration
2x GE 66.03 Gas Turbines
Each turbine has a nameplate capacity of 81 MW
1x Heat Recovery Steam Generators (HRSGs)
1x Steam Turbine
Grid Connection
Connected to the Sumatra grid, contributing to Indonesia's energy security.