Operations – Riau IPP

Operations

Efficient and Reliable Power Generation in Riau, Indonesia

Our Plant

The Medco Riau power plant (Riau IPP) is a 275 MW combined cycle gas-fired power plant located in Riau, Indonesia. Using two GE 6F.03 gas turbines in a 2x1 combined cycle configuration, the plant supplies efficient, reliable and environmentally-friendly electricity to PT PLN (Persero) under a long-term agreement.

Gas turbine
275 MW CCGT
2x GE 6F.03
FEB
February 2017

How Our Plant Works

Our plant operates in a 2x1 CCGT configuration, utilizing two GE 6F.03 gas turbines, HRSGs, and a steam turbine to generate a total of 275 MW of electricity efficiently and reliably.

  • 2x GE 6F.03 Gas Turbines
  • Each turbine has a nameplate capacity of 81 MW
  • 2x Heat Recovery Steam Generators (HRSGs)
  • 1x Steam Turbine
  • 2x1 Combined Cycle Configuration
2x1 Combined Cycle Gas Turbine (CCGT) Configuration
Gas Supply Gas Turbine 1 81 MW 81 Mw Gas Turbine 2 81 MW HRSG 1 Heat Recovery HRSG 2 Heat Recovery Steam Turbine Tx Tem? Gas Sens 275 MW 01 F5.8 Compressor efficiency
Our plant operates in a 2x1 CCGT configuration, utilizing two GE 6F.03 gas turbines, HRSGs, and a steam turbine to generate a total of 275 MW of electricity efficiently and reliably.

Key Equipment & Configuration

2x GE 66.03 Gas Turbines
Each turbine has a nameplate capacity of 81 MW
1x Heat Recovery Steam Generators (HRSGs)
1x Steam Turbine
Grid Connection
Connected to the Sumatra grid, contributing to Indonesia's energy security.